A village wishes to measure the quantity of water that is piped to a factory during a typical morning. A gauge on the water line gives the f
Question
A village wishes to measure the quantity of water that is piped to a factory during a typical morning. A gauge on the water line gives the flow rate (in cubic meters per hour) at any instant. The flow rate is about 100 m3/hr at 6 am and increases steadily to about 280 m3/hr at 9 am. Using only this information, give your best estimate of the total volume of water used by the factory between 6 am and 9 am.
in progress
0
Mathematics
5 years
2021-08-27T14:30:45+00:00
2021-08-27T14:30:45+00:00 1 Answers
195 views
0
Answers ( )
Answer:
570 m³
Step-by-step explanation:
The volume of water is the product of flow rate of water and the time taken. We are to get the volume of water used between 6 am and 9 am, that is for 3 hours (9 – 6).
We are given the flow rate at 6 am and the flow rate at 9 am, but this flow rate changes between 6 am and 9 am. To get the estimate of the water used, Let us assume that it flows at the same flow rate as it was at 6 am throughout, hence:
Also, let us assume that it flows at the same flow rate as it was at 9 am throughout, hence:
To get the best estimate of the total volume, let us find the average of the two values, hence: