how much work should be done to lift a 5kg brick to the height of 12m Question how much work should be done to lift a 5kg brick to the height of 12m in progress 0 Physics Thanh Hà 4 years 2021-08-12T10:32:20+00:00 2021-08-12T10:32:20+00:00 1 Answers 11 views 0
Answers ( )
Answer: 588 joules
Explanation:
Work is done when force is applied on an object over a distance ( whether vertical or horizontal). It is measured in joules.
Thus, Workdone = Force X distance
– Vertical distance to be moved by the brick = 12 metres
– Mass of box = 5kg
– Acceleration due to gravity when box was lifted represented by g is a constant with value of 9.8m/s^2
Now, recall that Force = Mass x acceleration due to gravity
i.e Force = 5kg x 9.8m/s^2
Force = 49 Newton
So, Workdone = Force X Distance
Workdone = 49 Newton X 12 metres
Workdone = 588 joules
Thus, 588 joules of work was done.