Which of the following is not considered a major work flow structure? A. Work center B. Project C. Assembly line D.

Question

Which of the following is not considered a major work flow structure?
A. Work center
B. Project
C. Assembly line
D. Fabrication
E. Continuous flow

in progress 0
Diễm Thu 2 months 2021-07-26T11:20:54+00:00 1 Answers 0 views 0

Answers ( )

    0
    2021-07-26T11:22:12+00:00

    Answer:

    The correct option is;

    D. Fabrication

    Explanation:

    A workflow flow is a detailed business process consisting of a series of required interconnected tasks in  directed graph format  that is executable by  workflow management system.

    Considering each of the options, we have

    A. Work center

    This consists of part of the transformation input to output. The location

    B. Project

    This is the unique identifier of the task to be processed

    C. Assembly line

    Forms part of the required input where transformation takes place and items are being processed within the assembly line

    D. Fabrication

    Here the item is fixed, without motion, therefore this is not considered a major work flow structure

    E. Continuous flow

    Here again, the items are being processed and are in motion, which constitutes a workflow structure.