    Answer:

    300 Bags

    Step-by-step explanation:

    According to the Question,

    • Given that, We are laying a concrete border around a circular pond.  The pond is 7 metres in diameter and is surrounded by a path 2 metres wide.

    The radius of the pool = 3.5 m; the overall radius including the border = 3.5 + 2 = 5.5m

    • The area of the concrete border

    overall area – pool area = border area(A)

    A = π×5.5² – π×3.5²

    A = 56.55 sq m  

    • The concrete needs to be 50 millimetres deep.

    the volume of the concrete, change 50 mm to .05 m

    56.55 * 05 = 2.8275 cu/meters

    • We are using premixed bagged concrete.

    1 cubic metre requires 106 x 20 kg bags.

    • So For the number of bags

    106 * 2.8275 = 299.715 ≈ 300bags

    • 300 bags of 20 kg of premixed concrete We need