( Can someone help? ) A 6-column table with 2 rows. The first column labeled number of washers has entries 1, 2. The second column lab

Question

( Can someone help? )
A 6-column table with 2 rows. The first column labeled number of washers has entries 1, 2. The second column labeled initial velocity v subscript 1 (meters per second) has entries 0.11, 0.13. The third column labeled final velocity v subscript 2 (meters per second) has entries 0.28, 0.36. The fourth column labeled time to travel 0.25 meters t subscript 1 (seconds) has entries 2.23, 1.96. The fifth column labeled time to travel 0.5 meters t subscript 2 (seconds) has entries 3.13, 2.61. The sixth column labeled Acceleration a = StartFraction (v subscript 2 minus v subscript 1) over (t subscript 2 minus t subscript 1) EndFraction (meters per second squared) has entries 0.19 and empty.

The acceleration of the car with two washers added to the string would be

in progress 0
Thành Đạt 2 months 2021-08-02T10:21:26+00:00 2 Answers 2 views 0

Answers ( )

    0
    2021-08-02T10:22:31+00:00

    Answer:

    The answer is 0.33

    Explanation:

    because if (v2-v1)/(t2-t1)

    then if you fill it in then you could definetly get the answer.

    0
    2021-08-02T10:23:16+00:00

    Answer:

    Answer would be 0.33

    Explanation:

    Calculations

Leave an answer

Browse

Giải phương trình 1 ẩn: x + 2 - 2(x + 1) = -x . Hỏi x = ? ( )