A project is located in an area with a demand-response program and on a site that has enough room for a wind-turbine to allow for on-site re

Question

A project is located in an area with a demand-response program and on a site that has enough room for a wind-turbine to allow for on-site renewable energy. If the project implements both of these strategies, which of the following will occur?

A. The project’s energy costs will decrease B. The project’s renewable energy production will decrease C. The project’s energy demands will decrease D. the project minimum energy performance will decrease

in progress 0
Calantha 2 months 2021-07-26T11:23:29+00:00 1 Answers 3 views 0

Answers ( )

    0
    2021-07-26T11:24:33+00:00

    Answer:

    A. The project’s energy costs will decrease

    Explanation:

    Since the project is located in an area with a demand-response program and on a site that has enough room for a wind-turbine to allow for on-site renewable energy.

    Hence, the project’s energy costs will decrease very well because it’s implementing both of these strategies;

    – Area with demand-response program.

    – On-site renewable energy.