A construction crew needs to build a road that will be 20 miles long. The crew already completed a stretch that is 6.44 miles long and another that is 8.62 miles long.
How much more road does the construction crew need to build?
A construction crew needs to build a road that will be 20 miles long. The crew already completed a stretch that is 6.44 miles long and another that is 8.62 miles long.
How much more road does the construction crew need to build?
The answer is 15.3.